Câu 7: NCP-AII: NCP-AI Infrastructure

You are validating the environment of an NVIDIA GPU-accelerated data center during post-deployment checks. Which one action is essential to confirm that power and cooling are sufficient for the stable operation of NVIDIA DGX H100 systems?

Nội dung câu hỏi

You are validating the environment of an NVIDIA GPU-accelerated data center during post-deployment checks. Which one action is essential to confirm that power and cooling are sufficient for the stable operation of NVIDIA DGX H100 systems?

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. Use NVSM to disable unused PCle devices to reduce overall system heat output.
  2. B. Review the system BIOS to ensure GPU overclocking is enabled for maximum performance.
  3. C. Verify that each DGX system is connected to redundant, properly rated PDUs and that all power supplies are reporting nominal input. — đáp án hiện tại
  4. D. Confirm the system fans are running at 100% under all workloads to prevent overheating.