Câu 6: PMI Construction Professional
A property developer is looking to develop a shopping mall. They have issued a short-term contract to an engineering firm to perform project validation and create an interim design to determine risks, constructability, optimum delivery method, and contract structure prior to committing substantial capital and resource…
Nội dung câu hỏi
A property developer is looking to develop a shopping mall. They have issued a short-term contract to an engineering firm to perform project validation and create an interim design to determine risks, constructability, optimum delivery method, and contract structure prior to committing substantial capital and resources. If the property developer is approved to proceed from the current contract life cycle stage, what should the next stage be?
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. Request for proposal (RFP)
- B. Pre-award — đáp án hiện tại
- C. Request for tender (RFT)
- D. Proposal process
Cộng đồng
0 bình luận công khai. Tên thành viên được ẩn một phần.