A construction professional discovers that the design drawings show the entry doors opening in the wrong direction, affecting the position of electrical switches. The construction professional can rectify this issue immediately on-site but decides to consult the client for a final decision. The client not only agrees…
Nội dung câu hỏi
A construction professional discovers that the design drawings show the entry doors opening in the wrong direction, affecting the position of electrical switches. The construction professional can rectify this issue immediately on-site but decides to consult the client for a final decision. The client not only agrees to the proposed change, but also adds an additional electrical switch because the design department discovered that this can increase usability. This is an example of what?
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. Change interference from the client
- B. Change orders generated in a short time
- C. Change that will result in a claim
- D. Change that is driven by a feedback loop — đáp án hiện tại