Câu 13: C-TS422-2023: SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing

You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?

Nội dung câu hỏi

You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. The new operation is inserted at the desired time; the previously dispatched operation is moved backward.
  2. B. The new operation is inserted at the desired time; the previously dispatched operation is moved forward. — đáp án hiện tại
  3. C. The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation.
  4. D. The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation.