Câu 27: PSPO I: Professional Scrum Product Owner I
Scrum is based on empiricism. All of its artifacts must be transparent to ensure sufficient accuracy of inspection. How can the Scrum Team maintain the Product Backlog to maximize its transparency? (Choose the best answer.)
Nội dung câu hỏi
Scrum is based on empiricism. All of its artifacts must be transparent to ensure sufficient accuracy of inspection. How can the Scrum Team maintain the Product Backlog to maximize its transparency? (Choose the best answer.)
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. Product Backlog items must be sized such that the highest ordered items are no bigger than a Sprint.
- B. The Product Backlog is continually kept up to date with the most recent insights. — đáp án hiện tại
- C. The Product Backlog is only updated at the Sprint Review, when both the Scrum Team and the stakeholders are available.
- D. The Product Backlog is only updated at a release planning meeting with the stakeholders and the change control board present.
- E. Product Backlog items should hold no more than 8 points of work, which is the average in the range of acceptable sizes of 1, 2, 3, 5, 8, and 13.
Cộng đồng
0 bình luận công khai. Tên thành viên được ẩn một phần.
Chưa có bình luận. Mở giao diện tương tác để bắt đầu thảo luận.