CertyRush
Đang tải...
C CertyRush
Câu hỏi free preview

Câu 17: VCS-274: Administration of Veritas NetBackup 7.7

An administrator has a scheduled policy that backs up 20 clients, each with multiple mount points and multiple streams enabled. One of the jobs has failed and is in an Incomplete state. How should the administrator verify the incomplete job runs prior to the next scheduled backup?

Nội dung câu hỏi

An administrator has a scheduled policy that backs up 20 clients, each with multiple mount points and multiple streams enabled. One of the jobs has failed and is in an Incomplete state. How should the administrator verify the incomplete job runs prior to the next scheduled backup?

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. run a manual job for the client
  2. B. resume the gob — đáp án hiện tại
  3. C. run a manual job for the mount point
  4. D. resume the parent job

Cộng đồng

0 bình luận công khai. Tên thành viên được ẩn một phần.

Chưa có bình luận. Mở giao diện tương tác để bắt đầu thảo luận.

Câu hỏi liền kề