Câu 7: VCS-277: Administration of Veritas NetBackup 8.0 and Appliances 3.0
A NetBackup master server has commenced writing four long-running duplication jobs to an AdvancedDisk disk pool. The value of Maximum concurrent jobs for the storage unit and Limit I/O streams for the disk pool are both set to 4. There are 35 jobs queued on the master server that require this disk pool:5 replication j…
Nội dung câu hỏi
A NetBackup master server has commenced writing four long-running duplication jobs to an AdvancedDisk disk pool. The value of Maximum concurrent jobs for the storage unit and Limit I/O streams for the disk pool are both set to 4. There are 35 jobs queued on the master server that require this disk pool:5 replication jobs with priority 999910 backup jobs with priority 99920 duplication jobs with priority 99Two restore jobs that require this disk pool are then submitted with a default priority. Which job type goes active next?
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. Backup
- B. Duplication
- C. Replication — đáp án hiện tại
- D. Restore
Cộng đồng
0 bình luận công khai. Tên thành viên được ẩn một phần.