Câu 54: 2V0-622D: VMware Certified Professional 6.5 - Data Center Virtualization Delta
An administrator wants to ensure that any virtual machine added to a certain port group always has sufficient network resources. Network I/O Control version 3 has been enabled on the Distributed Switch. Which three steps will achieve this objective? (Choose three.)
Nội dung câu hỏi
An administrator wants to ensure that any virtual machine added to a certain port group always has sufficient network resources. Network I/O Control version 3 has been enabled on the Distributed Switch. Which three steps will achieve this objective? (Choose three.)
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. Reserve bandwidth for virtual machine system traffic on the Distributed Switch Port Group.
- B. Edit the virtual machine's Resource settings and set a reservation for virtual machine system traffic.
- C. Create a Network Resource Pool on the Distributed Switch and set a reservation quota. — đáp án hiện tại
- D. Reserve bandwidth for virtual machine system traffic on the Distributed Switch. — đáp án hiện tại
- E. Add the Network Resource Pool on the Distributed Switch Port Group. — đáp án hiện tại
Cộng đồng
0 bình luận công khai. Tên thành viên được ẩn một phần.
Chưa có bình luận. Mở giao diện tương tác để bắt đầu thảo luận.