CertyRush
Đang tải...
C CertyRush
Câu hỏi free preview

Câu 9: CTAL-TM_Syll2012: ISTQB Certified Tester Advanced Level - Test Manager [Syllabus 2012]

Testing Process -The following are the exit criteria described in the test plan of a software product:EX1. The test suite for the product must ensure that at least each quality risk item is covered by at least one test case (a quality risk item can be covered by more test cases).EX2. All test cases in the test suite m…

Nội dung câu hỏi

Testing Process -The following are the exit criteria described in the test plan of a software product:EX1. The test suite for the product must ensure that at least each quality risk item is covered by at least one test case (a quality risk item can be covered by more test cases).EX2. All test cases in the test suite must be run during the execution phase.EX3. Defects are classified into two categories: “C” (critical defect) and “NC” (non-critical defect). No known C defects shall exist in the product at the end of the test execution phase. Which of the following information is useless when the specified exit criteria is evaluated?

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. A traceability matrix showing the relationships between the product risk items and the test cases
  2. B. A list of all the open defects with the associated classification information extracted from the defect tracking system
  3. C. A chart, showing the trend in the lag time from defect reporting to resolution, extracted from the defect tracking system — đáp án hiện tại
  4. D. The execution status of all the test cases extracted from the test management tool

Cộng đồng

0 bình luận công khai. Tên thành viên được ẩn một phần.

Chưa có bình luận. Mở giao diện tương tác để bắt đầu thảo luận.

Câu hỏi liền kề