Câu 3: Lead Auditor ISO 45001: PECB Certified ISO 45001 Lead Auditor
During a Stage 1 audit, the OHS Manager asks that the audit includes coverage of new work operations in a nearly facility they have expanded into since the application was made. Which two of the following actions should the auditor take? (Choose two.)
Nội dung câu hỏi
During a Stage 1 audit, the OHS Manager asks that the audit includes coverage of new work operations in a nearly facility they have expanded into since the application was made. Which two of the following actions should the auditor take? (Choose two.)
Các lựa chọn
Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.
- A. Determine whether the audit duration is sufficient to cover the new work operations.
- B. Suggest that the OHS Manager cancels the audit contract and reapplies for the new situation.
- C. Advise the OHS Manager that the audit duration has been set and the audit will need to proceed as planned.
- D. Advise the OHS Manager that, within the existing scope, the mew work operations can be included without any problem.
- E. Advise the OHS Manager that an extension of the scope is possible but will have to go through established procedures. — đáp án hiện tại
- F. Suggest that she will advise the programme manager that the audit scope should be revised to include the new work operations. — đáp án hiện tại