Câu 1: PMI Construction Professional

A large railway project is in the planning stage, and different options have been evaluated. A technical paper is published describing technology that may increase the efficiency of the transport route. However, the technology comes at a significant cost increase. The company tasked with the railway design needs to de…

Nội dung câu hỏi

A large railway project is in the planning stage, and different options have been evaluated. A technical paper is published describing technology that may increase the efficiency of the transport route. However, the technology comes at a significant cost increase. The company tasked with the railway design needs to determine if they should consider making changes based upon the study. What should the construction professional do to determine this request?

Các lựa chọn

Đáp án được giữ gọn theo nhãn A, B, C, D trong phần bình chọn tương tác.

  1. A. Contact the change control board (CCB). — đáp án hiện tại
  2. B. Speak with the design team.
  3. C. Send the request to their manager.
  4. D. Consult a subject matter expert (SME).